Cuba Accelerates Solar Expansion with 2,000 MW Plan by 2028

Posted by. Posted onSeptember 5, 2025 Comments0

The Cabaiguán photovoltaic park, with a capacity of 21.87 MW, located in the central province of Sancti Spíritus, began operations after just over two months of installation. This is part of Cuba’s national plan that calls for the construction of 55 solar parks by 2025, each with a capacity of 21.8 MW, with a total […]

The post Cuba Accelerates Solar Expansion with 2,000 MW Plan by 2028 appeared first on POWER Magazine.

Cuba-solar-power-installations-August-2025

Category

Leave a Comment